СМИС Эксперт » Implemented objects » Yuzhno-Balyksky gas processing plant

Yuzhno-Balyksky gas processing plant

Systems for monitoring the state of engineering complexes (systems) SMEC

Yuzhno-Balyksky gas processing plant

The works set on creation of the “Data collection and messaging system of a structured system of monitoring and managing the engineering systems of buildings and structures “(IATS SMEC)”:

  1. Supply the basic set of the SMEC Software and Hardware Package of the facility (SHP SMEC of the facility);
  2. Supply an interfaces set for the SMEC Software and Hardware Package of the facility (SHP SMEC of the facility);
  3. Perform construction and installation works (CIW);
  4. Perform pre-commissioning works (PCW);
  5. Develop the operation documentation;
  6. Consult the process and service personnel on work.