Olympic complex "Luzhniki"

Systems turnkey implementation SMEС and SMBS (from design to commissioning)

 

The works were carried out in 2016-2018

The systems for monitoring the state of bearing structures of buildings and facilities (SMBS) at the Luzhniki Stadium (Moscow).

18,5 km of cable are installed.

Installed sensors:

  • Inclinometers (SLOPE INDICATOR (USA) 43 pcs)
  • Strain-measuring devices(Geokon (USA) 80 pcs)
  • Accelerometers(SODIS stor (Russia) 16 pcs)
  • Tacheometers(Leica (Switzerland) 2 pcs)

 The list of works on the object:

  • SMEC and SMBS working documentation development;
  • materials and equipment supply for monitoring systems;
  • construction, installation and commissioning works on the systems SMEC and SMBS;
  • installation of on-site communication networks;
  • Xpert software delivery.